Percept Rosewood
Project Image : |
Features :
|
BUILDINGS
- 3 Blocks consisting of 25 Nos Super Deluxe Apartments.
- Earthquake resistant RCC frame structure.
- Inside walls finished with cement putty.
- Vitrified Tiles in all Bed rooms, Drawing, Hall & Kitchen.
- Matching skirting for all rooms.
- Designer ceramic tiles on wall upto door height.
- Anti skid floor tiles on floor.
- Hot and Cold water provisions in one bathroom.
- Sanitary ware of Hindware/Parryware or equivalent.
- Sleek C.P. fittings of Jaquar or equivalent brand.
- Granite top cooking platform with one stainless steel sink and drainboard.
- Ceramic tiles upto 2 feet above the platform with branded C.P. fittings.
- Provision for electrical Appliances like Chimney, Microwave, Water Purifier, Refrigerator.
- Concealed copper wiring (ISI marked) with modular switches.
- Inverter point in utility balcony.
- Geyser point in master toilet.
- A.C. provision (Split) in master bedroom only.
- Quality wooden door frame, Main Door Wooden with Mica / veneer finish.
- All other doors flush shutter / panel with PVC foil laminated doors.
- Main doors with godrej locking system.
- Sliding Anodized Aluminium windows with clear glass.
- Living Room with Aluminium Framed French Windows.
- DTH TV & Telephone points in drawing and master bedroom
- Latest exterior emulsion paint finish to withstand all weather conditions
- Grill upto 3 feet height
- Washing machine point in utility balcony
- Finished with Kota stone / marble and railings.
- Automatic lifts of Kone / Otis or similar make in each block.
- Adequate storage with deep tube well.
- Fire Extinguisher in each floor.
- DG Power backup for common areas in case of power failure.
- At the time of booking - 10%
- On signing of agreement(within 4 weeks of booking) - 20%
- On completion of foundation - 10%
- On Ground floor slab casting - 10%
- On 1st floor slab casting - 10%
- On 2nd floor slab casting - 10%
- On brick work - 10%
- External plaster - 10%
- On internal plaster & Interiors - 10%
- Balance on possession - 5%
CHARGES TO BE PAID BY OCCUPANTS
1. APDCL meter cost and load security, Transformer with substation and DG (for utility service only) to be borne by flat owners in actual.
2. Stamps Duty, Flat registration charges, Service Tax and other legal charges for registration of documents valuation report etc. will be paid by the flat owners.
Powered by vasp technologies